AMBO 5.25.2011 – The construction of 25 various development projects is underway in Midakegn Woreda, West Shoa Zone of Oromia State with over three million birr, the woreda administration said.
Woreda Deputy Chief, Shule Abdissa told ENA that the projects are in the areas of education, safe water provision, health and agriculture.
Shule, who is also head of the woreda agriculture office, said so far construction of a youth centre, a library and a cafeteria has been finalized.. The government and the public covered the cost for construction of the projects, he said.
Upon going fully operational at the end of this fiscal year, the projects will benefit over 50,000 residents, Shule said.
Source: ENA
Subscribe to:
Post Comments (Atom)
Ethiopian can not afford a prolonged war.
Ethiopian can not afford a prolonged war. Ethiopia as the poorest country in the world is dependent on aid. A prolonged war simply depletes ...
-
8/10/2012 The prolonged absence of Meles Zenawi, Ethiopia’s usually hyperactive prime minister, has sparked a covert succession struggle at ...
-
Addis Ababa, June 28 – Expansion project of Messebo Cement Factory that has been carried out at a cost of over 2.3 billion birr was i...
-
Wednesday, 29 August 2012 - African Development Bank approved a 251 million US dollar loan for Ethiopia. The two parties signed the loan agr...
No comments:
Post a Comment